Project Roadmap – Railway and Stations

48 MONTHS

RAILWAY  AND STATIONS DELIVERY PLAN

 1.      Establish Preliminary Engineering Design on Railway Route 

2.      Sort Layout , Business Concept & FeasibilityS 

3.      Sort Detailed Survey, Soil Investigation & EIA Study 

4.      Sort Land Acquisition Requirements 

5.      Procure Authority Approvals 

6.      Resolve Land Matters 

7.      Sort Procurement and Prices of Works 

8.      Legitimise Site Possession 

9.      Carry out Construction Works 

10.    Sort Pre-Opening Dry-Run 

11.    Ensure Timely Works. 

12.    Sort Railway Opening

 

STATIONS AND DESIGN IMPRESSIONS

Objective

The main objective of the preliminary surveyworks are to provide adequate framework for future survey and other related activities and studies which would enable data acquisition be made to assists in design and construction of proposed double track electrified railway from Savannakhet to Lao Bao .

Read more ...

Planning

Lao People's Democratic Republic, situated in north Indo-China peninsula, serves as an important linkage between China and ASEAN countries. Although Laos covering an area of 23.68 X 104 km2 only. Laos has a enormous virgin land with potential for economic development integral to its abundance of natural resources. 

Read more ...

Proposition

The Government of the Lao People's Democratic Republic have signed a Master Agreement on 9th November, 2012 with Giant Consolidated Limited for the railway construction of the part of Lao National Railway Network that is from Savannakhet to Lao Bao which is approximately 220km on a Build-Operate-Transfer basis.

Read more ...