SALIENT FEATURES OF RAILWAY PROJECT ROLL-OUT

1. AValidate Planned Alignment via,

  • LIDAR Survey - Done
  • Detailed Survey - Done
  • Soil Investigation & Geotechnical Assessment - Done

2. Establish Statement of Needs for Railway & Stations

3. Preliminary Engineering Design Work via,

  • Establish Right-of-Way (RoW)
  • Track Alignment & Track Design
  • Engineering Structure (e.g. bridges, viaduct, embankments
  • Hydrology Study
  • Environmental Impact Assessment

4. Establish Railway System Blueprint

5. Finalise Acquisition Plan & Invoke Acquisition Law

6. Site Clearance, Demolition and Earthworks including ground treatment, cutting & fillings, slope stabilization and other related geotechnical works

7. Infrastructure Works such as Tunnels, Bridges, Viaducts and Culverts

8. Track works including ballast/ ballast less base, sleepers & rails

9. Electrification System

10. Communication System

11. Ticketing System

12. Rolling Stock

 

13. Stations (Savannakhet-End Station, Nasy-Intermediate Station, Seno- Traffic Transit Hub, Phangho- Internediate station ((Atsaphangthong)), Phalanxay-Intermediate Station, Dongbang-Intermdediate station ((Mai Posi)), Xethamouak-Intermediate Station, Vangkoung-Intermediate Station ((Kammakon)), Sepon- Intermediate Station, Dong-Intermediate Station and Densavan-End Station) 

  • Looping Tracks & Sidings
  • Platforms & Connecting Bridges
  • Maintenance Depot
  • Freight Station
  • Carparks